OUR WORK

FEATURED WORK

PENNSYLVANIA TUNRPIKE COMMISION: FIBER OPTIC INSTALLATION

Our team at Thoroughbred Construction Group is proud to be installing a 163-mile, state-of-the-art fiber optic system along the Pennsylvania Turnpike, connecting Harrisburg to Pittsburgh. The project includes laying future path, jetting high-quality fiber optic cables both underground and aerially, and splicing cables to ensure seamless connectivity.

These efforts link the fiber to numerous demarcation sites along the route, providing the turnpike with faster, more reliable communications for operations and future upgrades. Coordinating underground and aerial installations allows for maximum flexibility and efficiency, overcoming the unique challenges of both trench and above-ground work.

This project strengthens critical infrastructure, supporting traffic management, operational communications, and future technological improvements. It’s a high-level, expert installation that ensures the Pennsylvania Turnpike Commision is prepared for decades of safe and efficient operation.

AWARD-WINNING WORK

PITTSBURGH SISTER BRIDGES: DECORATIVE LIGHTING

Thoroughbred Construction Group was proud to contribute to the award-winning decorative lighting project on Pittsburgh’s iconic Three Sisters Bridges. The Roberto Clemente, Andy Warhol, and Rachel Carson bridges are among the city’s most recognizable landmarks, known for their historic design, riverfront presence, and connection between Downtown Pittsburgh and the North Shore.

The project introduced a programmable lighting system that highlights the unique architecture of each bridge after dark. With dynamic displays for holidays, sporting events, and city celebrations, the lighting brings new visibility, color, and energy to these historic structures while enhancing the overall Downtown skyline.

This work helped transform the bridges into a vibrant nighttime landmark for residents, visitors, and commuters alike. It celebrates the history of the bridges while adding a modern feature that reflects Pittsburgh’s continued growth, creativity, and pride in its public spaces.

RECENT PROJECTS

Armstrong Tunnel - Pittsburgh, PA

Modern, reliable electrical systems were installed to bring the tunnel up to current safety standards. This project improved both safety and efficiency for one of the city’s key transportation routes.

Installed new power and control systems to support lock and dam operations. These upgrades enhanced functionality and long-term reliability of the site.

Our crew replaced the existing switchgear at Liberty Tunnel, upgrading the system with modern, reliable equipment. This work ensures safer operations and improved electrical performance for years to come.

Thoroughbred Construction Group delivered electrical work for open-road tolling infrastructure across the Pennsylvania Turnpike system. The project streamlined toll collection and modernized critical roadway infrastructure.

Selected to modernize the medium-voltage power distribution system as part of facility upgrades. The work ensured reliable service for a critical transportation hub.

Installed LED decorative lighting on the city’s iconic “Three Sisters” bridges. This project highlighted the structures with energy-efficient, long-lasting lighting.

Completed installation of electrical control systems, traffic control, ventilation, and tunnel infrastructure as part of reconstruction. The upgrades improved both safety and long-term operational performance.

Delivering precision and strength on every job.

Scroll to Top